Showing posts with label building. Show all posts
Showing posts with label building. Show all posts

Monday, 17 July 2017

Fire Ants Build Sinking 'Eiffel Towers' from Their Own Bodies


By Charles Q. Choi, Live Science Contributor | July 12, 2017 06:08am ET

Fire ants can build miniature look-alikes of the Eiffel Tower from their own bodies, and the insects perpetually rebuild the structures to save them from collapsing, a new study finds.

The insects crawl up and down these structures in a phenomenon that resembles a slow-motion water fountain in reverse, the researchers said.

The new study's finding could help lead to swarms of robots that can use their own bodies to form complex 3D structures, the scientists added.

Building rafts
Fire ants (Solenopsis invicta) evolved in the Pantanal wetlands of Brazil. In 2011, Craig Tovey, a biologist at the Georgia Institute of Technology in Atlanta, and his colleagues discovered the way in which colonies of these insects can shape themselves into raftsthat can stay afloat for months.

Fire ants can use sticky pads at the ends of their feet to link to each other and form a pancake-shaped raft. The 2011 study found that each ant's exoskeleton can trap air bubbles and become slightly water-repellent. Weaving a colony together leads to a more powerful waterproofing effect that keeps the raft dry while afloat in the water.


Sunday, 14 October 2012

Great crested newts discovery halts Corby school build


Work on a new primary school for a Northamptonshire town has stopped following the discovery of great crested newts.
The first pupils at Corby Primary Academy in Oakley Vale, Corby, will have to temporarily move to a refurbished former junior school.
The school will open as scheduled in September 2013, but with fewer pupils than planned.
The rare amphibians are protected by EU and UK law.
'Setback' for school
Councillor Andrew Grant, county council cabinet member for children, learning and skills, said: "There's no denying that this is a setback but we appreciate the ecological significance of the situation.
"The presence of the newts means that we are not permitted to start work on site until spring after the newts have been relocated."
Corby Primary Academy is being built on the site of Exeter Primary School.
The council has decided to refurbish the former school's junior block so the school can open on time.
This means it will only have 60 reception places and 30 places in years one and two when it opens next September.
If the build had not been halted, the school would also have had places for Key Stage 2 children.
Wildlife experts are now deciding what should happen to the newts.
Related Posts with Thumbnails

ShareThis